Major Projects
Current Featured ProjectsMajor Mining Project 2011: Most recently, Lake Excavating has been working at the Gibraltar Mine, just outside of Williams Lake, BC. As one of the largest open-pit mines in all of Canada, Lake Excavating has conducted a number of projects here. This includes working on the GDP3, the Tailings Dam Raise and Mud Haul. Click here for more information The Meadows Modular Home Park A 65 lot residential development including site grading, paved roads, curbing, and a 5.5 hectare water feature. This development offers over 10 acres of land in Whitecourt, AB. Click here for more information Hilltop Industrial Subdivision Lake Excavating performed a number of tasks at the Hilltop Industrial Subdivision in Whitecourt, AB. Click here for more information Aquatera Sanitary Trunk Main Phase 2 Phase 2 of a sanitary main line installation in the city of Grande Prairie, AB. Click here for more information Highway 32 Slope Stability Lake Excavating Ltd. worked alongside Thurber Engineering Ltd. to complete the Highway 32 Slope Stability project for Alberta Transportation in the Town of Whitecourt. Lake Excavating completed 30,000 m3 of granular borrow material placed for slope stabilization abutment. In addition to this, Lake Excavating completed borrow pit development and restoration, as well as replacement of native topsoil and placement of imported growth medium and hydro-seeding. |
Re: Williams Lake Wal-Mart Development Project “…we would like to acknowledge the tremendous efforts, dedication and professionalism of the Lake Excavating team in the timely completion of the site works and off-site works as part of the Wal-Mart project…”
Alex Karadjov, P. Eng.
Per Counterpoint Engineering Inc.
|
Other Major ProjectsCity of Fort St. John Sanitary Trunk Main Lake Excavating worked alongside engineers from Urban Systems Ltd. to install a Sanitary Trunk Main for the City of Fort St. John. This project included the installation of a 3,000 m sanitary main line, up to 10 m deep, with diameters of 750, 900 and 1,200 mm’s. In addition to this scope of work, Lake also constructed 24 PVC and concrete manholes, tie-in and out flow structures, and an 80 m Augered Crossing and piping installation under CN Rail, utilizing PVC-fused pipe. Mount Polley Mine Dam Raise Providing earth works for Imperial Metals’ Mount Polley Dam Raise. With the support of engineers from Klohn Crippen Berger Ltd., Lake Excavating provided earth works for a 3 m dam raise. This project required loading, hauling, placing, and compacting of 120,000 m3 for the Till Core Dam Raise, as well as 25,000 m3 for the filter and transition zone materials. City of Fort St. John Enerplex Complex This project consisted of installing a rain water reservoir tank, containing a 50,000 gallon underground cast-in-place and re-enforced concrete tank for the City of Fort St. John. This tank is used to store roof-top rain water for irrigation. Another project Lake completed at this complex was for DGS Astro-Paving. Here, Lake completed major storm sewer works including Storm-Ceptors and diversion chambers, as well as excavating and sub-grading work for the parking lot site. Aquatera Sanitary Trunk Main Phase 1 Installation of an 850 m Sanitary Main line with 1,200 mm diameter of PVC, up to 11 m deep in Grande Prairie, AB. With the support of engineers from Focus Corporation, Lake installed the Sanitary Trunk Main, constructed 8 2,200 mm manholes and completed live tie-ins to the existing trunk main. Cariboo Regional District Transfer Station Operation This project was carried out from 2004 until 2010 in Williams Lake, BC. Lake Excavating provided staff and managed the transfer station for civil waste disposal for the Cariboo Regional District. This project comprised of reloading, hauling and delivering of civil waste by means of tractors and 75 m3 walking floor trailers. Retail Development Hilltop Industrial Park River Valley Modular Home Park |
|
Commercial, Retail, Industrial Site Services
|
|
|
Blue Ridge Rd. Extension and Upgrading. – Industrial
|
|
Mink Creek Road Extension, Phase 1 and 2 – Commercial/Industrial
|
|
49th Ave. Extension – Commercial
|
|
Whitecourt Airport Rural Subdivision – Commercial
|
|
Dahl Drive Widening – Commercial/Industrial
|
|
Highway 43 and 42nd Ave. Intersection – Commercial/Industrial
|
|
Whitecourt Golf and Country Club – Commercial
|
|
|
Avion Developments Inc. – Commercial & Industrial Subdivision
12 Lot Commercial & Industrial Subdivision in Whitecourt, AB. Works included Clearing & Grubbing, Excavation & Site Development, Water & Sewer Mains, Road Works, Subgrade, Asphalt and Curb & Gutter. |
|
|
BCR – Canadian Tire, Williams Lake
Works included Site Works, Roadworks and Water & Sewer Installation. |
|
|
Cariboo Regional District
Hauling solid waste material with Tractor & Walking Floor Trailers from the Tipping Station in Williams Lake to Gibraltar Mines. |
|
|
City of Fort St. John
Sewer Upgrade. Works included Siteworks, Water & Sewer Main Installation. |
|
|
City of Williams Lake – 8th & Borland Reconstruction
Works included Subgrade, Roadworks, Asphalt, Curb, Gutter & Sidewalks, Landscaping and Restoration. |
|
|
City of Williams Lake – South Lakeside Drive
Contracts #1 & #4 for the South Lakeside Water and Sewer Installation. |
|
|
City of Williams Lake – Westside
Westside Drainage Improvements. Works include Water and Storm Sewer Mains, Storm Septor Installation, Roadworks, Subgrade, Curb, Gutter & Sidewalks, Asphalt. |
|
|
City of Williams Lake – Westside Drainage
Siteworks, Storm Sewer Installation, Water Retention Pond Construction, Landscaping & Restoration. |
|
|
E. Construction Ltd. – Town of Slave Lake, AB
Works included Site Works, Water and Sewer Installation. |
|
|
Elan Construction Ltd.
Excavation, Site Works, Water & Sewer, Underground Utilities and Roadworks for the Walmart Site in Whitecourt, AB. |
|
|
Town of Fox Creek – 2nd Ave Water & Sewer Installation
Industrial Area Underground Servicing including Water and Sewer Installation. |
|
|
Town of Whitecourt, Hilltop East Industrial Subdivision
Excavation, site development, water/sewer mains, lift station, road works, subgrade, asphalt and curb and gutter. |
|
|
Town of Whitecourt, Old Airport Industrial Subdivision
Excavation, site works and road works. |
|
|
Woodlands County – Whitecourt Airport Development
Works included Siteworks, Roadway and Taxiway. |
|
|
|
Residential Works |
Spruceview – Residential
|
Kreiner Crescent- Residential
|
Spruceview Townhome Site – Residential
|
River Valley State Estates Phase 3 – Residential
|
Wal-Mart Site, Whitecourt – Retail
|
CRU development at Wal-Mart site – Retail
|
Home Hardware Site – Retail
|
Eagle River Casino – Retail
|
Deer Park Estates – Residential
|
|
Highridge Enterprises Ltd.
Residential Subdivision Development (Loon Subdivision) in Williams Lake. Works included Clearing & Grubbing, Site Works, Roadworks, Water & Sewer Installation, Curb & Gutter. |
|
Pinetree Developments Limited
Eagle Ridge Subdivision Development – site development, water/sewer extension, underground services. |
|
Shelby Management
Terra Ridge Condo Development – site development, site works, water/sewer, underground services. |
|
Sprucelee Construction Ltd. – Glen Arbour
Site Development, Water & Sewer, Underground Utilities for the Seniors Housing Complex in Williams Lake, BC |
|
Spruceview Estates
Residential Subdivision: Site Works, Water/sewer, Asphalt, Underground Utilities, Curb and Gutter for Phases 5,6,7,8,9 in Whitecourt, AB. |
|
Westbend Holdings Limited
Dairy Lane Modular Home Park – site works, road construction, utilities. |
|
Western Estates
Modular Home Park – site works, water/sewer, road construction, utilities. |
|
|
Mining Site Works |
|
Gibraltar Mines
Loading and hauling Concentrated Ore from Gibraltar Mines to the reload station at McCallister using 2 Tractors with B-Train Side Dumps. |
|
Kinross Gold Corporation/QR Gold Mine (Quesnel)
Major reclamation work, load, haul & place shot rock. |
|
Mount Polley Mining Corporation
Till haul, filter sand haul. |
|
|
Road Building and Deactivation |
|
Canfor
Road building, road maintenance, deactivation and installation of culverts and remediation work around fish bearing streams. |
|
Clusko Logging Ltd. (Lovell Cove, Prince George)
Description of Work: Extensive road building, road maintenance or upgrade, pit development and gravelling projects. We have also hauled logs for this company as required. |
|
Lignum Ltd. (now Tolko Industries)
Description of Work: Building of mainline, on-block roads and forestry roads as well as build landings, deactivation of both logging roads and forestry landings, gravelling, road maintenance. |
|
Riverside Forest Products Limited (now Tolko Industries)
Road building, gravelling, road maintenance, millyard maintenance, plowing and sanding, installation of bridges, culvert/cattle guard installation and maintenance, as well as site works within the millyards at both Williams Lake and Soda Creek Divisions. |
|
Weldwood of Canada Ltd.
Road building. |
|
West Fraser Mills
Road building, deactivation, gravelling. |
|
|
First Nations Works |
|
Nenqayni Treatment Center
Major sewer upgrades, including lift station & drainfield, major water works including boring under Hawks Creek. |
|
Canoe Creek Indian Band
Subdivision Development Phase 1 Description of Work: Subdivision work including new water system. |
|
Seton Lake Band/Lillooet Tribal Council
Articulated rock truck work on the Connee Creek Watershed Restoration Project. |
|
Toosey Indian Band
Grading and gravelling of roads within the reserve. |
|
Ulkatcho Indian Band
Community Infrastructure Development, Anahim Lake, B.C. Description of Work: Water and sewer installation, electrical, lift stations and road construction and gravelling. |